Displacer Level Sensor Working
Displacer Level Sensor Working:– Displacer level sensor use Archimedes’ Principle to observe liquid level by unendingly measurement the load of a displacer rod immersed...
Displacer Level Sensor Working:– Displacer level sensor use Archimedes’ Principle to observe liquid level by unendingly measurement the load of a displacer rod immersed...
Control Valves Interview Questions:- in this post 27 nos. Questions discussed which is frequently asked in Interview 1. What is the valve cone? The...
A circulating fluidized-bed (CFB) reactor is extremely the same as a bubbling fluidized-bedreactor. the main distinction is that the gas rate. If the gas...
A fluidized bed consists of a bed of particles that’s unbroken fluidized by the continualupward flow of a gas. Typically, the process consists of...
Definition : Manometers is the devices during which an acceptable liquid is employed within the Mano-metric column to observe the difference in pressure between...
Adsorption operations exploit bound solids ability to preferentiallyconcentrate specific substances from solutions (gaseous or liquid) onto their surfaces.Thus, by contacting fluids with such solids,...
CUTTING PLANThe Pipe cutting plan shall be prepared for individual AFC piping isometric drawings by thepiping engineer. Wherever field-welded joints are shown in the...
Non Destructive Testing 2 4 CALIBRATION OF N.D.T. EQUIPMENT The N.D.T. subcontractor must submit the calibration register and calibration certificates to the P.C.R. together...
Non Destructive Testing:- Upon completion of oil and gas piping spools, the fabricated pipe spools need to be tested for their integrity to be...
1 MECHANICAL COMPLETION (MC) OF LINE WALKPiping line walk before commissioning shall revisit the ITR-A, ITR-B and punch list duringpre-commissioning. It must be ascertained...